Precautions for the construction of silo slipforms on rainy days
In progressSilo slipformDuring construction, there are sometimes unavoidable rainy days, so what should be paid attention to when slipform construction is carried out on rainy days? Come and have a look with the editor!
In the rainy weather silo slipform construction process, in order to make the slipform construction uninterrupted and ensure the continuity of the concrete panel, the following measures can be taken:
1,When it rains lightly, a smaller concrete slump can be used, which generally does not exceed4 cm. This is because the concrete storage section to the machine exit section is all carried out in the open air, which is affected by water., The water-cement ratio and slump of concrete will change during transportation and warehousing. Then the slump does not exceedAt 4 cm, when the chute slides down, there will be less mortar loss, which can meet the requirements of slipform construction.
2,When it rains moderately, in addition to the treatment of concrete with a smaller slump, the pouring speed must also be reduced. Generally, the pouring and sliding section is about to be within an hour.About 50 cm is fine.
3.When it rains heavily, the concrete warehousing can be stopped, but the interval between stopping concrete warehousing cannot exceedThree hours, that is, before the concrete is finally set, it is necessary to put it in the warehouse once as much as possible when listening to the rain or when it is less than the gap, and also to slide once.
4.Construction in rainy days, if the demoulded concrete is washed by rainwater, it will flow, and there will be pitting on the surface. Therefore, after the surface is smoothed, cover the transparent film to protect the initially demolded concrete.
5.It should also be noted that no matter how heavy the rain is, the silo surface must have a slope during the pouring process, and the concrete surface after entering the silo will also be tilted after vibrating. During the interval between warehouses, the drainage effect will be better and the mortar loss will be less.
Rainy daySilo slipformThat's it for the introduction of construction precautions. If you want to know more, you can consult Anhui Xingcheng Slipform Engineering Co., Ltd.!
Related News
- Slipform construction company takes you to understand how to protect the construction site platform
- Winter construction of cement warehouse slipform
- Handling of problems in slipform labor construction
- The main points of construction technology of slipform consultation
- Advantages of silo dome bracket
- Anhui Xingcheng slipform work clothes award ceremony and epidemic prevention condolences
- Anwei Xingcheng sliding mold contributes to China Grain Storage in the 2020 epidemic
- Slip form construction company shares the difference between slip form and climbing form
- Measures to avoid cracks on the wall of the silo's slipform construction
- The construction of the 9*φ12.5m silo funnel of the Menghai fragrant rice whole industry chain project in Xishuangbanna, Yunnan Province is completed
- Technical guarantee conditions before slipform construction
- Anhui Xingcheng Slipform Engineering Co., Ltd. wishes everyone a good Dragon Boat Festival in advance!
- How to choose jacks in slipform labor construction
- Projects under construction in Lintong: Northwest Great Grain Depot, Tsingtao Brewery's fourth largest factory in China, and the new factory area of China Standard Industry Group
- Slipform consultation on the treatment of problems in construction
- Slipform Consultation, the key points of slipform construction safety technology
- Anhui Xingcheng Slipform Engineering Co., Ltd. wishes everyone a happy Mid-Autumn Festival!
- What are the precautions for slip film construction in slip form consultation?
- Concentrate and unite your will to promote the steady implementation of project construction
- Happy News from Anhui Xingcheng Slipform Engineering Co., Ltd.