Slip form construction company shares the difference between slip form and climbing form

NowadaysSlipform construction companyI want to introduce you to the difference between sliding mode and climbing mode. I hope you can read the following carefully!

The full name of climbing form is climbing formwork. It can be understood literally that it can climb up through its own structure without the help of external machinery. The climbing form is mainly composed of the climbing formwork itself, the climbing frame and the equipment required for climbing. Its main working method is to pour one layer of formwork and then climb up to pour another layer of formwork. The climbing formwork must wait until the pouring concrete strength can meet the requirements of the demolition formwork before removing the climbing formwork in this section and proceeding to the next section of construction.

The slip form is a form that can slide freely in the horizontal and vertical diagonal directions to pour concrete. The feature of the slip form is that there is no need to wait for the concrete to solidify before removing the form. In addition, it can be moved at will during the pouring process, but it still has certain requirements for the type of concrete. When using slipforms to pour concrete, hard concrete must be used. Because the slip form needs to move the form at any time, not using hard concrete may cause the concrete boundary to collapse and damage.

Therefore, there is a big difference between the climbing form and the sliding form in the place of use. Climbing formwork is suitable for pouring concrete in high-rise buildings and tall buildings. Because the use of climbing formwork can reduce the dependence on external hoisting machinery in the pouring process, and reduce the use of external scaffolding, it will accelerate the pouring speed and improve the economic benefits to varying degrees.Sliding modeThe occupied space is small, the stability is high, the safety performance is high, and the seismic performance is high. Therefore, in large-scale projects such as water transportation projects, the templates used for pouring concrete are generally slipforms. However, because slipform pouring has higher requirements for mobility, it is not suitable to use slipform pouring concrete in buildings with more heterogeneous walls.

Sliding modeAs two different concrete pouring techniques, and climbing formwork, each has its own characteristics. When choosing a concrete pouring process, various intervention factors must be comprehensively considered to make a comprehensive and accurate judgment. That's it for introducing the difference between climbing mode and sliding mode! More aboutSlipform construction companyFor news like this, you can pay more attention to Anhui Xingcheng Slipform Co., Ltd.!