The quality of slipform construction is the prerequisite of engineering quality, so forSlipform labor constructionWhat problems will arise during the process? What should I do if there is a problem? Let’s discuss it with the editor!
During the construction of slipform labor, there will be problems such as tilting of the body, translation, torsion, and deformation of the mold body, as well as the appearance of concrete defects, and the bending of climbing rods. These problems are caused by asynchronous jacks, uneven loads, asymmetrical concrete pouring, and rapid correction. Therefore, in the process of slipform labor construction, the quality must be checked, and the inspection of the project must be strengthened to ensure a good construction operation state. In addition, problems found during the construction process must be dealt with in a timely manner.
1, Correction, use the jack height difference to correct the deviation or apply a certain external force to correct the deviation, but remember that the correction can not be too hasty, otherwise it will cause the concrete surface to crack and dead bend, as well as slipform deformation and climbing rod bending and other accidents happen.
2、For the bending of the climbing pole, welded steel reinforcement or diagonal support should be used. If the bending is severe, the climbing pole should be cut off, re-connected and then welded with the lower climbing pole, and welded with a "her"-shaped diagonal support .
3, Formwork deformation treatment, if part of the formwork with small deformation is to be restored by pressing with struts, when the deformation is serious, the formwork should be removed and repaired.
4, To deal with the defects of concrete performance, local vertical form can be used to fill up the expanded fine aggregate concrete one level higher than the original label and smooth it.
The problems arising during the construction of slipform labor should be dealt with in time to ensure the smooth progress of the construction. If you have more questions, you can pay attention to the official website of Anhui Xingcheng Slipform Engineering Co., Ltd.
Related News
- Slipform construction company takes you to understand how to protect the construction site platform
- Winter construction of cement warehouse slipform
- Analyze the cause of torsion in coal bunker slipform construction
- The main points of construction technology of slipform consultation
- Advantages of silo dome bracket
- Anhui Xingcheng slipform work clothes award ceremony and epidemic prevention condolences
- Anwei Xingcheng sliding mold contributes to China Grain Storage in the 2020 epidemic
- Slip form construction company shares the difference between slip form and climbing form
- Measures to avoid cracks on the wall of the silo's slipform construction
- The construction of the 9*φ12.5m silo funnel of the Menghai fragrant rice whole industry chain project in Xishuangbanna, Yunnan Province is completed
- Precautions for the construction of silo slipforms on rainy days
- Technical guarantee conditions before slipform construction
- Anhui Xingcheng Slipform Engineering Co., Ltd. wishes everyone a good Dragon Boat Festival in advance!