Banner

新闻详情

Home > news > Content

What are the precautions for slip film construction in slip form consultation?

Slipform construction operationIn needNoticeWhichmatterWoolen cloth?The editor of sliding mold consulting will take you to understand!

BasicDifferent from ordinary support templates, fixed wall membranes are used for sliding membranes; during the main construction of the building, wall templates are usually made according to drawings, usually used for buildings with multiple standard floors; wall templates are made, and hydraulic pressure is used The device lifts it. The wall formwork is connected with the hydraulic lifting frame, and the wall construction is carried out as a whole. Lift the formwork while tying the steel bars and pouring the concrete. The construction site is very large and is working as a whole, because at the same time all the wall parts are lifted, affected by the sliding formwork,needOperating parts and construction time are relatively tight. Raise the sliding film every time2 cm and will raiseScenariothe height of. The intermittent time will not cause adhesion of the mold,otherwiseThe consequences willCanVery serious; after completion, the sliding film frame will drive the template to slide toMutuallySet the height to free up space to support the flat formwork of the floor. Due to the continuous improvement of the sliding formwork construction formwork, the concrete has not completely cured before losing the protection of the formwork, so slippage sometimes occurs. The concrete wall collapsed; this must be controlled.

Slipform constructionPlaceSecurity issues that need attentionWhat are there?Slipform consultingThe editor will then take you to understand the mainIn the following five aspects:1. Falling from high altitude; 2. Object impact; 3. Electric shock injury; 4. Electric welding fire; 5. Working at height6.Personnel safety awareness and project management capabilities.