Several common slip form construction technical services
Today, the editor of Xingcheng sliding mode will introduce you to the common ones.Sliding mode technical service, Everyone can read the following carefully!
1,The process flow of the wall sliding form and the floor slab construction method. This process is characterized by the integration of the floor and the wall, good structural integrity, fast construction progress, and short construction period. A structural layer can be completed in three days.After the 5 to 6-story structure, interior decoration, door and window installation, and water, electricity and heating installation can be inserted in advance, which can speed up the entire process.
2. The process flow of the wall first sliding and floor follow-up method. Its process characteristics are not directly related to the wall sliding. The process schedule is relatively abundant. The quality of the floor slab is better at one time. The interior wall decoration and water and electricity installation can be inserted in advance. People; in addition, the template of the floor slab can adopt a shaped table or H-shaped bracket, which can effectively reduce the workload of disassembly and assembly. However, the disadvantage is that it consumes a lot of steel and requires a large one-time investment.
3. The floor slab is used in conjunction with the wall sliding pouring method. The characteristic of this process is that there are no reserved beards or holes on the wall to connect the floor slab, and the floor reinforcement must be pre-bound inside and leave the floor construction joint at the same time. Because the floor is matched with the wall and poured with a slide, there is no need to retain denser and larger holes when the wall slides, and more importantly, there is no need to retain anchors, steel bars and tie bars, which effectively reduces the construction process. Part of the interior wall trimming can be performed on the floor, and there is no need to hang a double-layer hanger under the operating platform, which can avoid high-altitude operations.
Sliding Mode TechnologyserviceIt is a relatively special technology, because the construction process has a certain degree of difficulty, and the continuous construction requirements for concrete are very high. Any disconnection of any link will affect the whole, so careful construction preparation and control work must be done. This is The key point for the successful completion of the project. More can continue to pay attention to Anhui Xingcheng Slipform Construction Engineering Co., Ltd.!
Related Industry Knowledge
- What conditions must be met before silo slipform construction?
- Thermal insulation measures for coal bunker slipform construction in winter
- Concrete pouring of shallow round warehouse slipform engineering
- Safety guarantee for slip form construction personnel of cement warehouse
- Slip form construction company analyzes the technical control problems of high-rise buildings slip form construction
- The application of lifting platform in slipform labor construction
- Slipform consultation on slipform construction process conditions
- Slipform technical service overview
- The comparison of the dome support of the shallow round warehouse and the traditional construction technology
- Construction measures to improve the smoothness of slipform labor construction
- Slipform Consulting-Principles of Slipform Construction Technology