Slipform construction company tells you the importance of personnel organization

During the entire slipform construction process, it is not only necessary to always pay attention to the slipping of the formwork, but also to arrange the work of the construction personnel during the construction, so as to avoid the lack of personnel during the construction process. Below bySlipform construction companyLet me introduce in detail what should be arranged in the slipform construction process?

1,Disposition of personnel in slipform construction

Because slipform construction is a coordinated construction of multiple types of work, during the construction process, various types of personnel must be properly configured. Usually there are concrete workers, steel workers, woodworkers, slipform workers and electricians on the operating platform, as well as internal and external cranes. There are light-receiving personnel on the racks, and there is a tower crane driver above them. When pumping concrete is used, there are pipeline maintenance personnel, and there are also rack workers who set up the runway at any time according to the sliding speed. It can be seen that the lack of staffing of any type of work will affect the progress of the entire slipform construction.

2,Personnel organization and coordination and unified command

The types of work are carried out on the same work surface at the same time, especially when everyone is not familiar with each type of work. This requires a certain amount of organization, coordination and unified command. The usual practice is that the general contractor has two shifts on the operating platform.There is a person in charge for each shift 24 hours a day, who is responsible for the organization, coordination and unified command of the personnel on the entire platform.

Each construction team should designate a team leader for each shift. If everyone is not familiar with it at the beginning, the person in charge of each team can be written on a sign. What needs to be coordinated and coordinated during the work, or what problems need to be dealt with. , Hello everyone, contact for negotiation.

What's more, no matter which type of work has a problem that requires the cooperation of other types of work, you must tell your own workers to respond to your own shift leader when there is a problem, and solve the problem through the shift leader to avoid conflicts between workers in directly dealing with the problem. If the squad leader cannot solve the problem, you can continue to report it up until the problem can be solved!

The importance of personnel arrangement in the construction of slipforms is introduced here. Anhui Xingcheng Slipform Engineering Co., Ltd. is a professionalSlipform construction company, Welcome everyone to come to cooperate!