Slip form construction company analyzes the technical control problems of high-rise buildings slip form construction
In order to ensure the quality of slipform construction of high-rise buildings, several preparations need to be done before construction begins, so thatSlipform construction companyGive everyone a good explanation of this professional knowledge.
Design work preparation
In the early stage of building design, the characteristics of slipform construction technology should be analyzed, and economic analysis should be carried out carefully. When deciding to use slip form construction technology for construction, the design should be combined with slip form construction technology in architectural design, structural design and equipment design. In particular, which structure type and layout should be adopted for the building, the feasibility of slipform construction technology should be considered.
Preparation before construction
Before construction, adequate preparations must be made, including labor organization and personnel arrangements, material supply and site arrangements, construction procedures arrangements, support rod (jack) inspection calculations, and slip speed control.
Slip form construction device
Before assembling the slipform construction equipment, we should conduct a comprehensive and detailed inspection and verification of the elevation and plane dimensions of the building. The assembly method and steps of the sliding mold are as follows: leveling and laying out the line, and placing the position of the components according to the drawings; assembling the lifting frame and the inner and outer ring skeleton, assembling in order from the inside to the outside, assembling the inner operating platform skeleton, and at the same time placing the outer ring Bound the transverse steel bars below; assemble the external and external operating platform framework; install the steel formwork. The copper pipes, rubber pipes and jacks of the hydraulic lifting system are installed; at the same time, the wooden frame of the operating platform is installed. Install the oil pump, and then install the hydraulic system test; install the horizontal transport work platform; after checking all the equipment and components, you can test the slide, and then install the internal lifting bracket and safety net after lifting to an appropriate height; after the test, pass the inspection Then you can switch to normal anti-skid.
The technical management of slipform construction is the key issue and the root of quality. Therefore, we must pay attention to the improvement of construction management level, and establish a complete construction management system for this purpose.
Today, the slipform construction company will share it with you, and we will see you in the next issue!
Related Industry Knowledge
- What conditions must be met before silo slipform construction?
- Thermal insulation measures for coal bunker slipform construction in winter
- Concrete pouring of shallow round warehouse slipform engineering
- Safety guarantee for slip form construction personnel of cement warehouse
- The application of lifting platform in slipform labor construction
- Slipform consultation on slipform construction process conditions
- Slipform technical service overview
- The comparison of the dome support of the shallow round warehouse and the traditional construction technology
- Construction measures to improve the smoothness of slipform labor construction
- Precision control system for granary slipform construction
- Slipform construction company tells you the importance of personnel organization
- Several common slip form construction technical services
- Slipform Consulting-Principles of Slipform Construction Technology