Banner

Slipform labor construction

Slipform labor construction
Slipform labor construction

Anhui Xingcheng Slipform Engineering Co., Ltd. is a company specializing in slipform labor construction. The slipform labor construction includes the connection between the three processes of tying steel bars, pouring concrete and lifting the formwork, repeating and continuous work. Once pouring, it will be lifted once. This continuous and alternate operation is mainly based on the support frame embedded in the concrete, and the hydraulic jack is used to climb up along the support rod, so as to drive the sliding form system as a whole until it reaches the required structural elevation. It's okay.

During the construction of slipform labor, the quality requirements for concrete are relatively high. It is required to do a good job in the design of the mix ratio of concrete. This is one of the important conditions to ensure the smooth progress of slipform labor construction. Smooth progress has a greater impact. Also, in the process of concrete construction and concrete pouring, be careful not to contaminate the steel bars, otherwise it will affect the quality of the project and the subsequent processes; and the concrete should be poured evenly, which will ensure favorable sliding. During the construction process, it is necessary to ensure the safe progress of various sub-projects such as formwork installation and removal, scaffolding and masonry, etc.as well asGuaranteeworkPersonal safety of personnel.